Auspex Posted June 18 Share Posted June 18 Hy, as the name of the title says, I have the "the production rate of the mining unit is diminished due to the lack of materials left in the pool for this ore type" problem. Although the pool is not exhausted yet.. Link to comment Share on other sites More sharing options...
Recommended Posts
Please sign in to comment
You will be able to leave a comment after signing in
Sign In Now