TillGerman
-
Posts
3 -
Joined
-
Last visited
Posts posted by TillGerman
-
-
45 minutes ago, Stryker2185 said:
Question where it says 0/3 is that referring to what? number of machines or whats being made or the maintain
At 1st picture you see on Machine9 11/420. So batch 11 of 420 is in progress.
-
Have both Versions in use and are running fine.
But with first Version in Maintain Mode it dont calculate ETA (allways showing "Calculate ETA") and the batchnumbers are negativ.
Would be great if ETA and Numbers work in Maintain Mode, but i dont know if it is possible.
Industry Progress HUD
in General Discussions
Posted
Use the crosshair and click.
On first Version i get CPU Overload errors and script stops.