Jump to content

Question, Why does a Refinery need 3000 L of ore to run Why ?


CptKidd
 Share

Recommended Posts

It is because NQ systems could not keep up with the level of industry people were creating after beta launch. So they increased minimum batch sizes to lessen the number of server calls required and save the servers.

 

It is mostly likely a temporary measure, but we do not know for sure or for how long.

Link to comment
Share on other sites

Please sign in to comment

You will be able to leave a comment after signing in



Sign In Now
 Share

×
×
  • Create New...